Project Management Case Study: An Post

This Project Management case study is based an An Post. An Post is the state-owned provider of postal services in Ireland,  providing “universal postal service” to all parts of the country as a member of the Universal Postal Union. 

What Were the Client’s Needs?

An Post contacted BPS Ltd with a requirement to install charging points at multiple facilities throughout the country including Waterford, Cork Kerry and Limerick. The project needed to be completed within a very tight timeframe. All of the works were carried out in a live environment so the key to this project was to ensure zero interruption to daily operations. Bps Ltd liaised with local management and consulting engineers to ensure a seamless flow to the installation process. 

How Did We Fulfill Their Needs?

By working closely with An Post throughout the process we carried out the works around the facility with little disruption to the centre. 

Charging points that were created through the project management case study.

Project Management Case Study Results

Successfully installed all charging points as requested in an efficient manner to the clients’ satisfaction. 

Contact Brosnan Property Management Solutions

We deliver exceptional experiences, implement impactful solutions, boost productivity, build resilience, and drive positive results for you and your business. Check out our other services such as our technical services, including HVAC and PAT testing solutions, to see how we can support your needs